News |
|
How much are the grants?
Grants are fixed for each type of measure as indicated in the table below.
Grant approval must be in place before any purchase of materials or commencement of measures undertaken.
Grants are paid after the measures are completed and the contractor has been paid by the homeowner.
In the instance where the cost of the work (vat inclusive) is less than the fixed grant amount, the actual cost will be reimbursed.
|
|
|
Competitions |
|
To be in with a chance of winning a copy of this fantastic DVD AN INCONVENIENT TRUTH simply answer this questions?
|
|
|
|
|
|
| Zone Control |
It is normally advisable to divide the heating system into separate zones.
This will allow independent operation of the heating system in different parts of the house.
Typical circuits would be the ground floor, the first floor and the domestic hot water storage cylinder.
Autonomous operation of the zones will be achieved if individual motorised valves or pumps are fitted to each zone.
Timer and thermostatic control will permit individual and economic functioning of the heating system in each part of the house.
Each zone will be switched on only at the times required by the household and when there is a demand for heat energy indicated by the thermostat located in that area.
|
|
|