News |
|
How much are the grants?
Grants are fixed for each type of measure as indicated in the table below.
Grant approval must be in place before any purchase of materials or commencement of measures undertaken.
Grants are paid after the measures are completed and the contractor has been paid by the homeowner.
In the instance where the cost of the work (vat inclusive) is less than the fixed grant amount, the actual cost will be reimbursed.
|
|
|
Competitions |
|
To be in with a chance of winning a copy of this fantastic DVD AN INCONVENIENT TRUTH simply answer this questions?
|
|
|
|
|
|
| Motorised Valve Controlling Hot Water |
The hot water cylinder should be supplied with heating water from the boiler via a separate circuit from the space heating circuits.
Two aspects of a hot water cylinder that should be controlled are the on/off times and the temperature at which the hot water in the cylinder is stored.
Motorised valve
The most common method of ensuring that the hot water cylinder can be heated at times when space heating is not required is to install a motorised valve on the space heating circuit so that it can be isolated from the cylinder heating circuit.
An alternative could be to provide individual pumps for the hot water cylinder and heating circuits.
|
|
|